Close

INSTALLATION IS QUICK AND EASY

BombNado has patented features that allow for and easy and quick installation. No heavy equipment needed and in most cases, the shelter can be completely installed in less than two days.

No Heavy Equipment Needed

The BombNado can be installed using only small machinery. The installation can be simplified into 4 stages. 1)CUT, 2)DIG, 3)ASSEMBLE, 4)BACK FILL. After cutting a hole in the desired location, a small excavator can be used to dig the hole. Then using a small forklift, each piece of the BombNado is moved into place and bolted together. Back fill with dirt or concrete and that's all there is.